Saturday 22 October 2022

Construction Quality Review: Parameters And Measures

Construction quality reviews are a non-negotiable while finalizing a property. No matter if you are buying a house for yourself or renting one to a tenant, a quality review during the construction process of a property is a must. The parameters on which you need to do a review are explained below.


What is a Construction Quality Review?

A construction quality review is a site-based, independent review of the quality of construction of any particular property. The quality review is done by a subject expert. It is done in two ways, one is generic and has several building stages for quality assessment. Another one is driven

A construction review includes a written data report in detail. It also entails the data comparing the whole building's performance against what was expected. The main aim of a construction quality review is to find the issues and the root cause of the issues that are occurring during construction. It helps in managing design, planning, material, or procurement. 

Parameters Of Construction Review

Contrary to the time and cost-controlling criteria, quantifying building quality is challenging. The quality measurement can be thought of simply as the level attained after comparing the achieved with the expected standard. This level of conformance is a method for quantifying quality.

This level of conformance can be described in terms of the number of inspections that either fall short of or meet the project's standards. Several parameters must be included in a project in order to have a successful implementation to regulate and measure the quality.

● The action plan, which describes the project and its purposes, is the initial step.

● The project's organizational procedures, methods, and tools make up the second parameter.

● Work ethics and culture, which encompass norms and people's behavioral functions, make up the third and final parameter.

An improvement will be seen when the aforementioned factors are combined, which might make reviewing quality easier.

How to Measure the Quality of Construction?

The main categories to measure quality are the following-

Preventive Quality Measures

Application of prior experience lessons, project-specific planning and reviews, alignment with client needs, pre-and post-activity meetings, ongoing verification and evaluation, and risk analysis are all examples of preventive actions.

This will actively maintain and assess quality on location. These measures enable management to anticipate problems before they arise. This statistic assesses the effectiveness of the work being done to calculate the accuracy.

Predictive Quality Measures

These are also called lagging metrics. This measure was created to identify a problem that arises due to poor application of the underlying quality process.

It takes into account quality events on a site, which are things that shouldn't occur during or after the building of any project of good quality. The number of project hours can be calculated using this quality incident rate.

Conclusion

Managing quality is essential in today's environment when design and construction requirements are becoming more complex in order to meet current building problems. The construction industry will improve and create a better workplace culture by using the right tools and digital technologies for monitoring construction quality.

This will result in a more effective process for constructing modern facilities on schedule, within budget, and with the highest quality. These cutting-edge methods must be used to assess the quality and are encouraged to provide positive outcomes with higher levels of quality for construction projects.

Saturday 24 September 2022

Important Guidelines For Constructability Building Review


Nothing is more problematic for contractors than projects that take longer than expected or are over budget. Through the integration of construction site knowledge into the design process, constructability review aids contractors in avoiding this. By removing work delays, rework during construction, and construction waste, constructability evaluation aids in minimizing project risk and overall project cost.

What is Constructability Building Review?

One essential component of a construction project is the constructability review. Reviewing all construction processes from beginning to end during the pre-construction or early design phase is the primary goal of the constructability evaluation. Before the start of the actual building, this constructability assessment assists in identifying and resolving various types of issues while minimizing mistakes, delays, and costs.

Constructability studies aim to save the owner time and money by identifying issues that may arise during building, such as mistakes, omissions, ambiguities, and conflicts. A CR will be advantageous for every construction project (and any suggested contract amendment).

Guidelines For A Constructability Review

There are a few things that a constructability reviewer needs to remember-

Focus on execution

Create the project, don't just concentrate on the issues. Only by spending the time to go through the laborious steps of construction will the issues be found. You shouldn't approach a constructability review as a task of reading through the construction documentation in search of issues, because those issues won't jump out at you.

Examine the interfaces of different systems

Problems are not found in the body of a system nearly as frequently as they are in the perimeter of a system where it interfaces with the many nearby systems and trades, regardless of whether they are interior, exterior, structural, or MEP.

Constructive Review

Be constructive when reviewing the preliminary documents. Be aware that the design papers are incomplete when conducting a constructability review on 50%, 75%, or even 90% of the documents. Additionally, you should avoid providing the design team with an extensive list of everything that has to be done. Initial assessments should concentrate on broad design strategies, fixing already-completed tasks, and locating the minute, easily overlooked details.

Focus on what's important

Think about these two things before you speak to the design team. First, "Will this affect the project's cost, timeline, or quality?" Furthermore, "Will the contractor, or subcontractors, require an answer to this issue to do their work?" Pose the remark if either of these questions has a yes response. Otherwise, commenting will take up time that the design team may be using to address other problems.

Conduct a thorough review

Even though a complete constructability study can take weeks or even months, the amount of time that can be saved by preparing a project in advance is exponential. Even while thorough assessments aren't always finished and integrated into design papers in time for bids, it's still crucial to deal with issues as soon as they arise in a project.

Benefits of Constructability Building Review

  • Re-work-related change order difficulties will be less frequent since the errors will be found and fixed before the incorrect work is done.
  • The luxury of time to analyze and haggle the general contractor's and subcontractors' change order pricing. Time restraints frequently drive you to quickly approve change order requests when issues are found while working.
  • Preventing delays brought on by issues uncovered during building. Progress is often slowed, if not stopped, by the time it takes to analyze a problem and come up with a solution.

Summary

It's important to realize that constructability assessments are advantageous to a project in numerous ways. For instance, a constructability review is a great opportunity for the reviewer to understand and become familiar with all of the complex details of a project.

Friday 22 April 2022

Why You Need Building Code Review Checklist

 

The code review process is one of those things that varies from team to team and is governed by developer standards. It's a complicated procedure that necessitates a building code review checklist that every business must follow before executing a code review. This checklist is intended for both novice and experienced developers, and it includes both a necessary and ideal list for conducting a code review.

This list is language-independent, so you may use it with almost any programming language without making major changes. In this post, we discuss a building code review checklist based on the behaviours that developers overlook when developing reviews for construction. 

Manageability

Examine whether the building code review checklist is easily accessible, understandable, and managed. You should format the code in such a way that it is easy to read. Significant steps and directions should be commented on for clarity, while remarks that are a barrier to comprehension should be eliminated.

If necessary, you can erase all comments and restore them from an SVN file. Make sure you're using the correct language and that your code is aligned with the correct spaces. Your code should be able to fit on a screen so that it may be viewed on other monitors. 

Architecture

To be consistent, the building code review checklist should adhere to a specific architecture throughout the application. When judging architecture, the design pattern stated earlier must be used as a guide. If any design modifications are required, make sure to document, approach, and baseline them before putting them in place.

According to the requirements, the code should be divided into three layers: presentation, business, and data. The code design should be consistent with previous project products and software. 

Maintainability

The most typical goal of building code review checklist is to enhance code quality and make it more maintainable. A high-quality code has a minimal level of technical debt and requires the least amount of assistance in future development and alterations. Maintain four aspects for greater code quality: code readability, testability, debuggability, and configurability.

The code should be self-explanatory and easy to read for any developer. The code should be simple to test in any way conceivable, without failing even in the most unusual circumstances. Try using interfaces to communicate between levels for this.

 Usability

Consider yourself a user of the building code review checklist you're developing, and ask you if the software's user interface is intuitive. Any difficulties you have when using the product as the author of the code may become a bigger issue for end-users.

People rush into the development phase so quickly that they forget that a lack of acceptable will lead to a slew of problems. If you're not convinced by user interface design, get your team together and work on it. 

Reusability

Reusability of building code review checklist is an important aspect in lowering the length and size of your files, as well as saving space and making the code more organised. Examine your application to see if any methods or code blocks aren't repeated. Make use of reusable generic classes, functions, and components. Don't duplicate code by following the DRY principle. 

Correctness

This is a test of the code's ability to produce output. Unit cases should test all edge cases without failing, while test strategies should be provided and executed. Tests are required to cover any nonobvious logic.

There should be no racing to get around the problem. Before commencing the code review process, it is critical to establish a design standard. The team must establish some guidelines for developers and reviewers to follow when evaluating. 

Conclusion

Building code review checklist is a vital procedure that can be accomplished by following these guidelines, although it is a difficult task to complete manually. To ensure that all of these checks are completed flawlessly,

Buildings that are safe to occupy necessitate the careful selection of materials and construction procedures that decrease the risk of fire and other life-threatening issues. Building codes are enforced by local governments to guarantee that dangerous structures are either repaired or demolished. When purchasing or selling a home, it's critical to make sure that it's up to code and that no costly upgrades are required.

 

 


Friday 8 April 2022

Let’s Talk About Mistakes To Avoid While Constructing Office Building in 2022

 


Anyone involved in constructing a business will tell you how frustrating and time-consuming it is. They may have encountered some nasty surprises or made a costly mistake. And it likely took a long time for the dust to settle and things to get back to normal once the mistakes are done. 

It takes an army to operate things. And when it comes to constructing larger than life corporate buildings, the job becomes more tedious. The beautiful and mesmerizing building that you see while travelling requires huge planning. 

Being such a massive and long process, mistakes are bound to happen. But there are some mistakes that can bring your huge loss and thus, must be avoided. 

Let’s talk about these mistakes. 

Mistakes To Avoid While Constructing Office Building 

1. Not hiring professionals for constructability review 

Before starting off anything, you need to ensure whether it is worth the effort and something that is achievable or not. This is what constructability review does. 

It brings all the professionals that have different roles to play in the construction process under one roof so as to discuss different parameters of the construction and draft a plan that will lead to the ultimate success. 

Constructability reviews at the early stage will make sure that the process will have zero errors and will be done within the desired period of time. Thus, skipping this step is a blunder that you must prevent. 

2. Don’t crack a deal that make your regret 

Instead of hiring a contractor in a hush-rush, do your proper research and make sure that you’re not getting fooled. Look what other contractors are charging for the same project and then decide whom to work with. 

The contractor you select may not really understand the scope of

work best, or have bid the project exactly as you’ve requested, or be the best fit for your project and this can bring trouble in your paradise. 

So, be conscious about where you’re investing your hard-earned money. 

3. Signing the lease way before it’s needed 

There’s a right time for everything and doing right things and wrong time will take you nowhere. Similarly, signing the lease way before time will just make you regret it in the future. 

Involving your project team before signing the lease will give you peace of mind, and help make sure you won’t regret the terms of your legal agreement. 

Before rushing into a lease, you and your broker need to partner with some design and construction pros to really understand your workspace. Your design must be developed enough to give you a reasonable estimate of costs for your build-out. 

Once you’re done with it then move forward with the leasing process. 

Summary 

Constructing an office building is a long term investment in terms of time and one of the biggest investments in terms of money and thus, you need to be on your toes from the very beginning of the project. 

You need to monitor everything so as to ensure that you’re getting the best results of your money. So, avoid the above-mentioned mistakes and make sure that you get your desired end-result.           

 


Wednesday 23 March 2022

Why is a Constructability Review Conducted by Experts?

 


Constructing a house is a big task. It takes a lot of time and manpower. It is a complex task to accomplish and there is no scope of any mistake or error. It is extremely important to ensure that the final outcome will be a replica of what you desired it to be. 

Not just that, when it comes to the workplace things get more serious. The ambience of the office space plays a key role in advertising your organization as it is the first impression on your clients, employees and visitors. 

If we talk about the interiors, they have the potential to make employees more productive. 

All this can be ensured through a constructability review done by experts at the early stage of construction. This review has a plethora of advantages that we will be discussing in this article. 

Advantages of constructability review 

1. It ensure reduce cost and greater productivity 

A thorough check of all the aspects of construction at an early stage will eradicate the changes of error and zero error means zero wastage of material and money. 

Any error will not only lead to the wastage of material but doing anything again will cost double and will reduce the profit that you will be generating. 

Thus, this review will save your dollars and must not be skipped. 

2. Ensure that the project will meet its deadline 

Such reviews are done to analyse any error and address it way before it gets too late. Due to this, when the construction began everything fell at its place aptly. This helps in ensuring that the project will be delivered at time. 

The review becomes even more essential when it comes to projects that have tight deadlines as there is no room of error in such cases.

 3. Saves you your time, energy and money 

It enables identification of anticipated construction problems with the design so that the design can be altered and a deeper understanding of some of the project’s costs, timelines and build-ability issues so that adjustments can be made. 

This ability to change and alter the design of the project, if needed, in the design stage rather than in the construction stage, saving time, energy and money that contributes greatly to the success of the project. 

So, these reviews give you a chance to review the bid-ability of the project based on the clarity of the specifications and drawings and save your time, energy and money that will be investing in re-doing anything due to any error in the design.  

4. Ensure optimum quality of the result 

Incorporating constructibility ideas may sometimes call for changes which will add time to the design schedule. Assurance that the Champion has the authority to approve such changes, encourages the proper commitment of time to perform productive constructability reviews. 

The message is conveyed that the standard for top performance is measured by quality in terms of biddability, buildability, and maintainability in the project rather than by merely

meeting a predetermined schedule. 

Summary 

Constructability reviews are a must for the construction process as these processes are among the most complex and perplexing jobs to be accomplished. So, if you don’t want any trouble in your paradise, don’t skip it.  

 

 


Tuesday 15 March 2022

All you need to know about Interdisciplinary Coordination Reviews

 The Interdisciplinary Coordination Design Review is useful in spotting coordination flaws and omissions in building documentation. Cleaning up multidisciplinary coordination mistakes in construction papers decreases time extensions, the most common source of modification orders, and limits responsibility claims and increasing the quality of design.

The Interdisciplinary Coordination Reviews may help by eliminating unnecessary RFIs, change orders, and project delays while also enhancing relationships between owners, architects, engineers, and contractors.

Prior to procurement and construction, the Interdisciplinary Coordination Reviews is a preconstruction service that identifies, tracks, and communicates construction document coordination issues to the design and project teams. It may quickly uncover coordination concerns amongst construction disciplines by comparing and contrasting a project's virtually full construction papers. In this article, we will discuss about Interdisciplinary Coordination Reviews in detail. 

What is interdisciplinary coordination? 

·         Overruns in the budget owing to reworks and material waste. Inadequate design data availability to all design stakeholders at the appropriate time. Unreliable decision making at vital phases, as well as the emergence of unnecessary conflicts, contribute to missed deadlines. Interdisciplinary Coordination Reviews and workflow disputes are unnecessary. 

·         Between plumbing and site trades, mechanical and general building trades, structural steel and miscellaneous metals trades, and other trades, there can be similar gaps. The project architect's proactive cooperation throughout the construction documents phase may usually assist to eliminate these gaps. 

·         By communicating with allied disciplines, reviewing applicable trade practices and laws, and allocating responsibilities to the most appropriate party, "proactive" coordination implies being involved in detecting and emphasizing probable gaps and managing document updates to minimize the gaps. 

Problems caused by ineffective coordination:

·         Overruns in the budget owing to reworks and material waste.

·         Inadequate design data availability to all design stakeholders at the appropriate time.

·         Unreliable decision making at vital phases, as well as the emergence of unnecessary conflicts, contribute to missed deadlines.

·         Interdisciplinary design and workflow disputes are unnecessary. 

The Importance of Interdisciplinary Coordination Reviews in Construction

This is exactly what the construction business requires, and it necessitates collaboration and coordination among all construction disciplines, including architectural, structural, and mechanical and electrical engineering. Professionals providing Interdisciplinary Coordination Reviews services may easily generate coordinated models because layouts are usually included into architectural and structural blueprints.

With bias toward any one field, no building construction project can be completed properly. Because of their interdependence, engineers, architects, and construction firms must all place equal emphasis on ensuring on-time project completion. 

Most common Interdisciplinary Coordination conflicts in building construction project include:

The structural engineer cannot create a pillar without first understanding the building's architectural design. To sustain the stresses, glass high-rise structures require not just superb design but also accurate load estimates and structural integrity.

As a result, the specialists from all three disciplines must grasp each other's and the project's requirements and technicalities in order to design a building of sufficient strength and satisfy its intended needs. The coordination and coherence across these disciplines facilitates on-site activities and cuts down on wasteful man-material traffic. 

Conclusion

The Interdisciplinary Coordination Reviews are critical to operating engineering projects efficiently and satisfying your clients' expectations. The Interdisciplinary Coordination Reviews will focus on important principles for all engineering disciplines to understand the "big picture" of multidisciplinary projects, rather than technical know-how. 

It intends to set the stage and give some pointers to help new professionals evolve into well-rounded engineers. Coordination across architectural, structural, and MEP disciplines is practically impossible without Interdisciplinary Coordination Reviews, since it will not produce the required outcomes. As a result, the usage of Interdisciplinary Coordination Reviews becomes a must rather than an advantage.

Tuesday 22 February 2022

What are the Features of Digital Plan constructability Review Process?

 

The goal of Digital Plan constructability Review Process is to make sure that projects are biddable, buildable, cost-effective, and easy to manage. By preventing work delays and rework during construction, as well as lowering construction wastes, constructability reviews assist to reduce project risk and final project cost.

In the Architectural, Engineering, and Construction (AEC) business, Digital Plan constructability Review Process is encountering obstacles. Problems such as change orders and rework emerge during construction as a result of the fragmented design and construction process, resulting in poor schedule and cost performance.

To increase project performance, the notion of "constructability" has been introduced to optimize construction knowledge and expertise during the design phase. Let’s discuss about the features of Digital Plan constructability Review Process.

 Features of Digital Plan constructability Review Process

The basic purpose of any Digital Plan constructability Review Process is to record the possible advantages of conducting reviews and to confirm their use. The use of case studies was judged acceptable for this research endeavor in order to assess and show the possible benefits of constructability reviews. Projects were chosen to encompass a wide range of construction and design elements, as well as scope and price

 Project Characteristics

Project type, density of adjacent development, expected construction cost, project designer, highway district, project manager, and project origination were all things to think about. It was expected that the small number of case studies would yield insignificant findings in terms of the influence of these criteria.

However, an assumption was made to take into account a balanced distribution of projects with higher and lower expected construction costs. The projected construction cost threshold of ten million dollars was chosen based on the average expected construction cost for all projects assessed.

Reviewer

This variable was taken into account in order to ensure sufficient distribution among the many reviewers who completed reviews. However, due to the small number of instances, any substantial examination was impossible; hence this was just a minor factor in the case selection process.

 Project stage

Case studies should be chosen from projects that have recently passed the Digital Plan constructability Review Process. The selection of these projects was thought to be acceptable since the final design would have been finished and the project may have started construction, allowing for an examination of potential change orders and cost issues. This allowed for an exact estimate of the impact of each review remark on the project's cost, as well as the identification of any potential flaws in the completed evaluations.

 Geographic distribution

To avoid a concentration of cases in a single district, adequate coverage of cases across the state is desired. This requirement was eased since, owing to the limited number of instances, all districts would not be represented.

Previous studies has examined the structure of Digital Plan constructability Review Process knowledge and concluded that the right amount of detail of constructability input should be considered at the appropriate phase of facility design. Knowledge-based systems and quantitative modelling are two approaches that have been created for assessing and analyzing constructability.

Conclusion

However, due to the limits of such technologies, the applicability for Digital Plan constructability Review Process has been limited. The current work offers a case study analyzing the applicability of Building Information Modeling (BIM) to Digital Plan constructability Review Process, in light of the introduction of virtual prototyping in the AEC sector.

The method for capturing design-related Digital Plan constructability Review Process concerns using BIM information is examined. The advantages of employing BIM as a shared knowledge resource to enhance constructability assessment and decision-making processes prior to construction are explored.